Reference |
Research Area |
Title |
|
1.1 |
Cuttings Pile Contents |
Determination of the physical characteristics of cuttings piles, using existing survey data and drilling information
|
|
1.2 |
Cuttings Pile Toxicity |
Determination of the toxicity characteristics of cuttings piles, using existing survey data and drilling information.
|
|
1.3 |
Cuttings Pile Toxicity |
A preliminary study of the toxicokinetics of drill cuttings contaminants in marine sediment.
|
|
2.1 |
In-Situ Environmental Impact |
Faunal colonisation of cuttings piles based on literature review and field studies
|
|
2.2 |
In-Situ Environmental Impact |
Contaminant leaching from drill cuttings piles based on literature review and field studies
|
|
2.3 |
In-Situ Environmental Impact |
Natural degradation and estimated recovery timescales based on literature review and field studies
|
|
3.1 |
Environmental Effects from Disturbance |
Identification and quantification of potential disturbance of in-situ piles
|
|
3.2 |
Environmental Effects from Disturbance |
Mathematical model of pile dispersal following disturbance
|
|
4.1 |
Bioremediation Solutions |
Acceleration of Natural Degradation
|
|
5.1 |
Covering Solutions |
Study into the practicality of covering cuttings piles in-situ
|
|
6.1 |
Removal Solutions |
Identification and effectiveness of drill cuttings removal methods
|
|
6.2 |
Removal Solutions |
Proposed methods of lifting drill cuttings for treatment and/or disposal
|
|
6.3 |
Removal Solutions |
Determination of environmental effects of removal solutions
|
|
7.1 |
Onshore Disposal Solutions |
Study into the impact of onshore disposal of recovered pile contents
|
|
7.2 |
Offshore Disposal Solutions |
Study into the impact of offshore disposal of recovered pile contents
|
|
8.1 |
New Technology |
To encourage invention and development of new technology and to assess the benefits and difficulties of such new technology
|
|
9.1 |
Cuttings Pile Acceptance Criteria |
Determination of acceptance criteria for cuttings pile management
|
|
10.1 |
Executive Summary |
Collation of Phase 1 reports and preparation of an executive summary report, "Key facts" data sheet and presentation
|
|
10.2 |
Data Gaps |
Collation of data gaps/information needs identified in each of the Phase 1 projects.
|